Moving plan for Phase I
People affected by the renovation will be moved into temporary spaces while the construction takes place. Relocated space will be located in The Sunrise Building, Fireside Lounge, Performance Lounge, space at Puyallup campus. While some decisions about the relocations are still in process, we have determined the following:
| Group | Existing Location | New Location |
|---|---|---|
| Zone 1 Move (June 15th-ish) | ||
| College Relations | 4th floor Cascade | Puyallup |
| Student Media Center | 4th floor Cascade | 4th floor Cascade (rm 400H) |
| Library Circulation Desk | 4th floor Cascade | 4th floor Cascade (stay in Library) |
| Pioneer Newspaper | 4th floor Cascade | C322 |
| Staff Lounge | 4th floor Cascade | C240 |
| Mail Room | 3rd floor Cascade | 2nd floor Cascade |
| Mac Lab | 4th floor Cascade | Sunrise N112 |
| Zone 2 (July 15-Aug 15th-ish) | ||
| Financial Aid | 3rd floor Cascade | Partial Puyallup/Partial C326 |
| Access & Disability | 3rd floor Cascade | Sunrise ( N115) |
| Work Force/Job Connection | 3rd floor Cascade | Sunrise (N118) |
| Testing | 3rd floor Cascade | Sunrise (N117) |
| Cashier | 3rd floor Cascade | Performance Lounge (C421) |
| Registrar | 3rd floor Cascade | Performance Lounge (C421) |
| Registration | 3rd floor Cascade | Performance Lounge (C421) |
| Admissions | 3rd floor Cascade | Performance Lounge (C421) |
| Advising | 3rd floor Cascade | Sunrise (N117/118) |
| Women & Family Services | 3rd floor Cascade | Sunrise (N115) |
| VSO/Eval | 3rd floor Cascade | Performance Lounge (C421) |
| SMS | 3rd floor Cascade | Performance Lounge (C421) |
| Security | 3rd floor Cascade | Performance Lounge (C421) |
The PC lab in N112 will be merging with the lab currently in N113 after the end of summer quarter.
The following classrooms will be taken off-line during the renovation:
- Classrooms 310, 311, 312, 314, 405, 407
- Lecture Hall 320
- Classrooms N114, N115, N116, N117, N118, N119