September 2008

 Pictures of the Building

 

Taken 9/29/08

Second Story wall going in from far side

View From Skybrige

View south end Sunrise

Forms outside the performance lounge

Rain runoff Pit Closed up

 

Taken 9/23-24/08

Second Story wall going in from far side

From Commons near sunrise building

From 3rd floor Olympic

From Science Wing

South pod bottom floor forms being set

 

 

Taken 9/17/08

Runoff pit is being filled in and closed

View from Science Wing

Lower pod plumbing

Middle Pod Walls from performances lounge

From Sunrise

From Skybridge

 

Taken 9/8/08

Runoff Collection Pipes

Runoff Pipes being placed in ground

First window hole in Concrete middle pod from skybridge

Same wall from commons

Lower pod plumbing beginning out performance lounge

Outside Science Wing

Cool Crane Shot

 

Taken 9/3/08

From Dental Hygiene Parking lot

From Performance Lounge

From Commons

From Skybridge

From Science wing

 

Back to Main Building page